Siemens ITE Specifiche

Navigare online o scaricare Specifiche per no Siemens ITE. Siemens ITE Specifications Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa

Sommario

Pagina 1 - Circuit Breakers

Bulletin SIB 2.7-7AI-T-E® Molded CaseCircuit BreakersSensitrip®JD & LD-FrameInformation andInstruction Guide

Pagina 2

8JD and LD-Frame Trip AdjustmentsFunction PerformanceContinuous Ampere (Ir) Varies the level of current the circuit breaker will carry without trippin

Pagina 3 - 3-Pole, 200-600 Amperes

JD and LD-Frame Trip Adjustments9Continuous Current (I,) and Long Time DelayAll models have a Continuous Current and Long Time Delayadjustment. This s

Pagina 4 - IMPORTANT

10JD and LD-Frame Trip AdjustmentsShort Time Pickup/Short Time Delay (Optional)Circuit breakers with the letters “NT” in the catalog numberhave an adj

Pagina 5 - Information and Instructions

JD and LD-Frame Trip Adjustments11The ground fault option has two modes of operation. Themodes are set by a switch on the side of the trip unit with t

Pagina 6 - — 3-Pole

12JD and LD-Frame Time Current Curves

Pagina 7

JD and LD-Frame Time Current Curves13

Pagina 8 - Figure 2

14JD and LD-Frame Time Current Curves

Pagina 9

JD and LD-Frame Time Current Curves15

Pagina 10 - Breaker Functions

16JD and LD-Frame Let-Trhu I2t CurveTypes SCJD6, SCLD6

Pagina 11 - Instantaneous Pickup

JD and LD-Frame Let-Trhu Current (Ip) CurveTypes SCJD6, SCLD617

Pagina 13

18I-T-E Rear Connecting StudsGeneral DescriptionOne complete rear stud assembly requires the following:1 1-12 threaded stud 1 “T” connector1 Molded st

Pagina 14

Installation, Diagrams19

Pagina 15

20I-T-E Plug-In AdaptersGeneralA complete plug-in installation requires one line end adapterassembly (consisting of a mounting block, tulip connectors

Pagina 16

Installation Diagrams21

Pagina 17

22I-T-E Pressure Wire ConnectorsGeneralEach connector kit contains a solderless connector andassociated hardware for making one line or load connectio

Pagina 18 - JD and LD-Frame Let-Trhu I

I-T-E Compression Connectors (CCL600)23GeneralNOTE: This instruction sheet outlines the recommendedinstallation procedure. Use of these lugs in some i

Pagina 19 - Types SCJD6, SCLD6

24I-T-E Handle Locking DevicesATTACHING I-T-E HANDLE BLOCKING DEVICE(J6HBL)To Block Handle ONTurn Breaker ON. Assemble blocking device to breaker bypo

Pagina 20 - I-T-E Rear Connecting Studs

I-T-E Internal Accessories25Circuit Breaker PreparationA. Depress trip button (Figure 1 ) to trip circuit breaker priorto removing cover. Before attac

Pagina 21 - Installation, Diagrams

I-T-E Internal AccessoriesC. Slide accessory down to rest on pad (6) trip unit. Whenaccessory is installed correctly, front of accessory (7) willrest

Pagina 22 - I-T-E Plug-In Adapters

I-T-E Shunt Trip and Undervoltage Trip27Shunt TripA. Reset and turn circuit breaker ON.B. Attach test circuit to accessory leads. When the testvoltage

Pagina 23 - Installation Diagrams

I-T-E® JD & LD-Frame Circuit Breakers3-Pole, 200-600 AmperesTypes SJD6, SHJD6, SLD6, SHLD6, SCJD6, SCLD6Digital Solid State Circuit BreakersTable

Pagina 24 - Installation

28I-T-E Auxiliary Switch and Bell Alarm SwitchAuxiliary Switch KitsCatalogNumberNumberofSwitchesAmpere Rating of SwitchVolts AC Volts DC120 240 480 12

Pagina 25

29A. Cut slot and holes in enclosure flange for operatinghandle (1), provide mounting holes for circuit breaker (2)and support member (3) as shown.B.

Pagina 26 - I-T-E Handle Locking Devices

30I-T-E Rotary HandleEnclosure MechanismTypes 1, 12Variable Depth (D11CJU2)GeneralHandle with permit locking the disconnect device in the OFFposition

Pagina 28

32Standard Depth (RHOJSD)Variable Depth (RHOJVD)General InformationWhen properly installed, the rotary handle operator providessingle point latching o

Pagina 29 - Electrical Check

Installation Diagrams33

Pagina 30

34I-T-E Max-FlexTM Flange-Mount Handle OperatorGENERAL INFORMATIONDescriptionThe I-T-E Max-FlexTM Flange-Mount Handle Operator is aflexible cable cont

Pagina 31 - I-T-E Slide Handle Operator

I-T-E Max-FlexTM Flange-Mount Handle Operator35INSTALLATIONMounting Max-FlexTM Handle Operatorto Enclosure Frame AssemblyA. Drill the mounting holes i

Pagina 32 - Enclosure Mechanism

36I-T-E Max-FlexTM Flange-Mount Handle OperatorAdjusting Door Catch MechanismA. Close the enclosure door and move the handle into theON position. Adju

Pagina 33

I-T-E Max-FlexTM Flange-Mount Handle Operator37Tighten Detent ScrewsB. Secure the cable (16) to the frame assembly (4) by placingit between the cable

Pagina 34

2IMPORTANTThe information contained herein is general in nature and is not intended forspecific application purposes nor is it intended as a training

Pagina 35

38I-T-E TELEMAND(R) Electric Motor OperatorGeneralThe motor operated mechanism is designed to open, closeand reset a circuit breaker or switch by remo

Pagina 36 - Flange-Mount Handle Operator

I-T-E TELEMAND(R) Electric Motor Operator39F. With the circuit breaker handle in the OFF position, alignthe motor operator mechanism rollers (indicato

Pagina 37

40Installation Diagrams

Pagina 38

I-T-E Panelboard Connector Straps(1)41

Pagina 39

42I-T-E EnclosuresType 1—J6N1, L6N1General purpose indoor, sheet-steel enclosure for use innormal atmosphere, listed as service-entrance equipment.Typ

Pagina 40 - Electric Motor Operator

I-T-E Door Latch Mechanism (DKR2, DKR3, DKL2, DKL3)(1)43General InformationThese door latch mechanisms are for use in standard orcustom built enclosur

Pagina 41

44Installation Diagrams

Pagina 42

45I-T-E JD and LD-FrameNeutral Sensing TransformerGeneralA. Turn off power feeding this device before starting theinstallation.B. Also turn off any li

Pagina 43

46I-T-E JD and LD-Frame Neutral Sensing TransformerTerminal ConnectionsA. After properly orienting and mounting the neutral sensingtransformer, mainta

Pagina 44 - I-T-E Enclosures

I-T-E Universal Test Kit (TS-31)47Universal Test KitCaution: Remove electrical loads from the circuit breaker tobe tested prior to performing tests. F

Pagina 45 - Adjusting the Mechanism

Information and Instructions3GeneralJD and LD-Frame Solid State Sensitrip style breakers of theSentron family are for use in individual enclosures, sw

Pagina 46

48I-T-E Universal Test Kit (TS-31)Enter Test to performH. If you press ENTER, you will be prompted for the phaseto test: The TS-31 will display:Enter

Pagina 47 - Neutral Sensing Transformer

Ordering Information49SJD63-Pole, 600V ACCatalogNumberMax.Cont.CurrentRatingCont.CurrentSettingLongTimeDelayInstantaneousSettingShortTimePick UpShortT

Pagina 48

50Ordering InformationSLD63-Pole, 600V ACCatalogNumberMax.Cont.CurrentRatingCont.CurrentSettingLongTimeDelayInstantaneousSettingShortTimePick UpShortT

Pagina 49 - Operating Instructions

Ordering InformationShunt Trip Control Voltage 1 Shunt Trip 1Shunt Trip and1 Auxiliary SwitchAC DC Catalog Number Catalog Number2448120208240277480600

Pagina 50

52Ordering InformationItem Catalog No.PressureWire Connectors(1-2) #3/0-500 MCM (Cu) TA2J6500(1 -2) #4/0-500 MCM (Al)(1) 500-750 MCM (Al)(1) 500-600 M

Pagina 51 - Ordering Information

UL Listings and File Numbers53I-T-E UL-489 FileNumberCSA ReportNumberBreakersTerminal ConnectorsPlug-ln ConnectorsRear StudsHandle OperatorsMotor Oper

Pagina 52

Siemens Energy& Automation, Inc.3333 State Bridge Rd.Alpharetta, GA 30202Bulletin SIB2.7-7 A (New) 1190 ©1990 Siemens Energy & AutomationSieme

Pagina 53

4I-T-E JD and LD-Frame Outline Drawings(1) — 3-PoleTypes SJD6, SHJD6, SLD6. SHLD6

Pagina 54

I-T-E JD and LD-Frame Outline Drawings(1) — 3-PoleTypes SCJD6, SCLD65

Pagina 55 - UL Listings and File Numbers

6I-T-E JD and LD-Frame Installation InstructionsGeneralNOTE: This instruction page outlines the recommendedinstallation procedure.The JD and LD-Frame

Pagina 56 - Alpharetta, GA 30202

JD and LD-Frame Trip Adjustments7

Commenti su questo manuale

Nessun commento