Installation
4.3 Electrical installation
52
AC main power supply
Connect the AC cables (going towards the MS transformer) and the PEN conductor.
Ensure that the phase sequence is correct (clockwise).
Ensure that the screws are tight and the cable has sufficient strain relief.
Figure 4-10 Cable connection for AC power supply
Figure 4-11 SINVERT 500 TL AC power cable connection
Figure 4-12 Strain relief for cables