Siemens 5935 Specifiche Pagina 101

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 174
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 100
8
Testing XMU
+
Installation
The final step in XMU+ installation is to ensure that the XMU+ is properly
connected to the PBX.
There are two tests that must be completed to confirm that the XMU+
system has been installed correctly:
Test system power and basic processor card operation.
See Testing Basic XMU+ System Health on page 96.
Test the telephone lines connected to the XMU+ to ensure that they are
connected and active. See Testing XMU+ Line Connections on page 100.
In this chapter...
About XMU+ Testing on page 95.
Testing Basic XMU+ System Health on page 96.
Test ing XMU+ Line Connections on page 100.
Vedere la pagina 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 173 174

Commenti su questo manuale

Nessun commento